BPP11: Affidavit as to Roadway Pavement and/or Sidewalk and Curb Construction


This form is required to obtain a signoff of a BPP application. It must be prepared by an architect or engineer. BPP11 Form - Rev. 9/03

Download

Need Help with Forms or Permits?

Let Build Nexus guide you through the NYC DOB process. We’ll ensure your forms are correct, submitted on time, and help resolve any permitting challenges.